Products

Energy storage and power solutions covering all scenarios

232K Industrial and Commercial Energy Storage

232K Industrial and Commercial Energy Storage

Equipped with high-safety lithium iron phosphate cells and featuring a partitioned isolation design to ensure ultra-long cycle life; - Constructing a three-level intelligent protection system of cell-module-system, covering real-time monitoring, proactive early warning, and automatic fire suppression, providing comprehensive safety protection;
90c07ac899b1500ecead6a1c8c56591c
Contact Us →

Product Details

High security 

- Equipped with high-safety lithium iron phosphate cells and a partitioned isolation design to ensure ultra-long cycle life;

- Constructs a three-level intelligent protection system for cells, modules, and the system, encompassing real-time monitoring, proactive early warning, and automatic fire suppression, providing comprehensive safety assurance;

- Adopts a three-level BMS architecture of central control, master control, and slave control to achieve full-domain battery management. It also features EMS and cloud connectivity capabilities, is compatible with multiple mainstream communication protocols, and forms a smart brain for distributed control.

 
Grid friendly 

- Seamlessly integrates with power grid dispatch commands, supporting primary and secondary frequency regulation, high-low voltage load switching, AGC/AVC, and other power grid control strategies;

- Possesses excellent peak-shaving and valley-shaving capabilities, effectively regulating load and significantly reducing energy costs.


Economical and efficient 

- The DC side adopts a single-cluster design, achieving zero loss in parallel capacity;

- Employing a three-level topology and intelligent thermal management technology, the converter (pcs) achieves a peak conversion rate of over 91%, leading the industry in energy efficiency.


Intelligent Operation and Maintenance 

- Employs modular design and direct parallel connection technology to achieve flexible and elastic capacity expansion;

- Supports modular design, significantly improving operation and maintenance efficiency.


668d2f22-840a-435d-adec-4a0cafa2cc48

ModelHLY-ELS24001Y 215KHLY-ELS26001Y 232KHLY-ELS26001Y 261K
DC Side Parameters


Cell TypeLFP-3.2V280AhLFP-3.2V280AhLFP-3.2V314Ah
Modular Configuration1P48S1P52S1P52S
System Configuration1P240S1P260S1P260S
Cell Voltage Range600V–876V650V–949V650V–949V
Cell Nominal Capacity215 kWh232 kWh261 kWh
Max. Current175 A192 A192 A
AC Side Parameters


Rated Output Power100 kW125 kW125 kW
Rated VoltageAC380/400 VAC380/400 VAC380/400 V
Rated Current144 A180 A180 A
Rated Frequency50/60 Hz50/60 Hz50/60 Hz
Output Wave Distortion≤3%≤3%≤3%
System Parameters


Dimensions1049×1360×2393 mm
CommunicationRS485, LAN
IP RatingIP54
Fire Protection SystemPerfluorhexanone, aerosol, composite detector
Operating Temperature Range–20℃ to 50℃ (derating required above 45℃)
Allowable Humidity0–95% (non-condensing)
Allowable Altitude≤2000 m (derating required above 2000 m)
image



Product Structure Diagram

23ec755c62e2c03bcf45f17fb8af4abf
610f1165bac15ecf29e31129c57fae0e

Scene usage

  • cb4ba80aa3f09e467632b0f4f0430092
    Spain
    Energy storage system: 625kwpcs+1305kwh liquid cooling battery all in one cabinet
    Application scenario: Farm
    Date of shipment:May,2025
    Application:A European farm uses five
    125kW/261kWh cabinets to store solarenergy and ensure backup power for
    critical operations
  • Energy storage system: 2sets 125kw pcs+261kwh liquid cooling battery all in one cabinet</br>Application scenario:Renewable Energy Community in Europe</br>Delivery data:Oct,2025</br>Application:Deploying PV </br>250kW/522kWh cabinet enables affordable solar power, with excess energy stored for reliable supply.
    Poland
    Energy storage system: 2sets 125kw pcs+261kwh liquid cooling battery all in one cabinet
    Application scenario:Renewable Energy Community in Europe
    Delivery data:Oct,2025
    Application:Deploying PV
    250kW/522kWh cabinet enables affordable solar power, with excess energy stored for reliable supply.
  • Energy storage system: 2sets 125kw pcs+261kwh liquid cooling battery all in one cabinet</br>Application scenario :Estonia</br>Delivery data:Mar,2026</br>Application:With commercial electricity at ~€0.156/kWh in Estonia, two  125kW/261kWh systems are deployed for peak shaving and load shifting.
    Estonia
    Energy storage system: 2sets 125kw pcs+261kwh liquid cooling battery all in one cabinet
    Application scenario :Estonia
    Delivery data:Mar,2026
    Application:With commercial electricity at ~€0.156/kWh in Estonia, two 125kW/261kWh systems are deployed for peak shaving and load shifting.
  • Energy storage system: Energy storage system: 2* 125kW / 261kWh Liquid Cooling Cabinet</br>Application scenario:Factory</br>Date of shipment:July,2025</br>Application:Two 125kW/261kWh hybrid cabinets with 200kW MPPT enable a Solar + ESS + DG solution, ensuring 24/7 power for a Philippine factory.
    Philippines
    Energy storage system: Energy storage system: 2* 125kW / 261kWh Liquid Cooling Cabinet
    Application scenario:Factory
    Date of shipment:July,2025
    Application:Two 125kW/261kWh hybrid cabinets with 200kW MPPT enable a Solar + ESS + DG solution, ensuring 24/7 power for a Philippine factory.
  • Energy storage system: 2* 125kW / 261kWh Liquid Cooling Cabinet </br>Application scenario:Farm</br>Delivery data:Dec,2025</br>Application:A Thailand farm uses two 125kW/261kWh all-in-one cabinets to optimize peak/off-peak usage and reduce energy costs.
    Thailand
    Energy storage system: 2* 125kW / 261kWh Liquid Cooling Cabinet
    Application scenario:Farm
    Delivery data:Dec,2025
    Application:A Thailand farm uses two 125kW/261kWh all-in-one cabinets to optimize peak/off-peak usage and reduce energy costs.
  • Energy storage system:2* 125kW / 261kWh Liquid Cooling Cabinet</br>Application scenario :Industrial park</br>Delivery data:May,2025</br>Application:This project features an AC-coupled solar + ESS system with two  125kW/261kWh cabinets, storing excess solar energy and supplying loads during peak hours to reduce grid dependence.
    Italy
    Energy storage system:2* 125kW / 261kWh Liquid Cooling Cabinet
    Application scenario :Industrial park
    Delivery data:May,2025
    Application:This project features an AC-coupled solar + ESS system with two 125kW/261kWh cabinets, storing excess solar energy and supplying loads during peak hours to reduce grid dependence.

Production Line

  • Airtightness Test
  • Box Assembly
  • EOL Test
  • Left Airtightness Test
  • Laser Welding
  • Right-Laser Cleaning
  • Left 2 - Polaroid Photo
  • Insulation Testing

FAQ

Q:What is your lead time for the mass production?
A:General speaking, about 25-30 days depending on different items after getting down payment and confirmation about the samples.


Q:What kind of certificates do you have?
A:We can provide CE, ROHS, FCC, IEC62133, MSDS, UN38.3 & etc. if your need.


Q:Are you a factory or a trading company
A:We are a professional rechargeable lithium-ion battery and LifePO4 battery manufacturer, welcome to visit.


Q:What information do you need to make a customized battery pack?
A:We need the details below:
1. Size of the battery pack you need in mm.
2. Capacity of the Battery pack.
3. Voltage of the battery pack.
4. Max discharge current.
5. Cable and connector types you need.
6. Casing and Terminals if required.
7. Any protection circuits you may need.


Q:Are you battery real capacity?
A:All of our battery cells with Grade A, 100% new and real capacity.


Q:What is your company's advantage?
A:We only supply high level quality of lithium battery and we gurantee on-time shipment, we also provide excellent after sales service.


Q:Do you accept OEM/ODM?
A:Yes, it is avaliable.


Q:Do you provide after-sales serive?
A:Yes, the warranty is usually 3 years, if any quality problems on our side in this period, we can send new one as replacement.


Q:Can I have samples to test? And what is lead time for sample order?
A:Yes, we can supply samples, the lead time for samples is 7-10 days. And buyers pay for sample cost and shipping cost.

Contact Us

Submit

Product Recommendation